TN OF TREATED WASTE

+

M2 RECOVERED

+

20 TREATMENT PLANTS BUILT THROUGHOUT THE COUNTRY

SERVICES


WORKS

Bahia Blanca

Construction and Operation of Landfill

The work consists of the construction of a final disposal module with its infrastructure. The Module is defined as a design unit surrounded by circulation embankments. From the constructive point of view, each module forms a sealed enclosure that prevents the lateral migration of leached gases and liquids to the outside. This condition is fulfilled when building the perimeter embankments and waterproofing them. Since 2008 we are responsible for the Operation of the Complex.
CABA, Bs. As.

PLANT OF INTEGRAL TREATMENT OF ARIDOS RESIDUES, REMAINS OF WORK & CONSTRUCTIONS

The Plant for the Integral Treatment of Aggregate Residues, Remains of Works and Construction of the Autonomous City of Buenos Aires is located in the Recycling Center of the City of Buenos Aires. The construction, installation and start-up of the plant were carried out, and the operation and maintenance of the Plant has been carried out since 2013, providing a comprehensive treatment and recovery service. The purpose of these works is the progressive reduction of the final disposal of the arid waste, remains of works and constructions through the adoption of a set of measures aimed at reducing the generation of waste, selective separation, recovery and the recycling.
Catamarca

MSW Treatment and Final Disposal Center

The construction of the Center for Treatment and Final Disposal (CTDF) of RSU in a land provided by the municipality of SFVC, called El Pantanillo. It is located 11 km from the city of SFVC. For the management of 150 tn. generated per day in the region, with the re-functionalization of a classification line and the construction of a new additional line. For the rejections of the two classification lines and everything that can not be recovered, a modular sanitary landfill will be built. In addition, the technical closure of the BCA that is located in the grounds of El Pantanillo. All this is complemented by the commissioning and operation of the CTTF of El Pantanillo.
Junin

Closure and Technical Closing of the BCA

In the current site where the operations with solid waste are carried out, the Closure and Technical Closing of the BCA is carried out, complementing the work with the execution of the new module of Final Disposal, which will have a system of collection and extraction of leachate, with the installation of sumps that will allow the reinjection of the extracted liquid, which can also be transported to a settling basin built outside the limits of the module, for temporary storage.